<delect id="sj01t"></delect>
  1. <em id="sj01t"><label id="sj01t"></label></em>
  2. <div id="sj01t"></div>
    1. <em id="sj01t"></em>

            <div id="sj01t"></div>
            試題

            下半年初級商務英語考前沖刺習題

            時間:2025-01-14 23:52:52 試題 我要投稿
            • 相關推薦

            2016年下半年初級商務英語考前沖刺習題

              距離2016年下半年商務英語初級考試越來越近了,大家要抓緊時間復習,下面是yjbys網小編提供給大家關于初級商務英語考前沖刺習題,希望對大家的備考有所幫助。

            2016年下半年初級商務英語考前沖刺習題

              Questions 8-12

              l Read this memorandum.

              l Choose the best sentence from the list A – I to fill each of the blanks.

              l For each blank (8 - 12) mark one letter (A - I) on your Answer Sheet.

              l De not mark any letter twice.

              l One answer has teen given as an example.

              MEMORANDUM

              To: Filma Williams, school of Architecture

              From: Ram S. Johnson, Physical Plant Operations

              Subject: Air-conditioning Installation Costs for East Hall.

              Date: 4.4.94

              As you requested in your memo of March 15, we have studied the costs of installing air conditioning for the seven offices and two studio classrooms in East Hall ____ Example ____

              Office and Classroom installation

              Estimates were obtained from three contractors on the costs of covering the offices and classrooms ____ 8 ____ The work would take about three weeks.

              Because the central unit would be installed on the roof, some noise problems might occur during a four-or five-day period ____ 9 ____ Sheet metal work to build out lest in the classes could be dine on weekends, and the overtime labour costs of about $ 1,500 have been included in the estimates.

              Arrangements were not made to do the office space installation on weekends … 10 …

              Additional Installation

              Because a larger installation, including a more powerful central unit, would be necessary to handle the halls and stairways, an additional $6,000 would be required for the equipment. ____ 11 ____ If this additional work were delayed until a later time, a new central unit would be required along with changes in the pipe way ____ 12 ____

              Summary

              The total job for the building would be about $ 35,000 if done at one time. A two-stage installation would cost about $55,000. I can get official bids at your request.

              Example: A

              A. As you suggested, we also sought information on the additional cost of air conditioning in the entrance halls and stairways.

              B. All these three were in the $ 20,000 to $ 25,000 range.

              C. This later installation would cost about $20,000.

              D. However, class interruption should be minimal.

              E. In the same way, each of these three would take at least one month.

              F. Therefore, the total cost was this $6,000 plus another $5,000.

              G. Labour costs would be an additional S 5,000, bringing the total cost of the addition to $11,000.

              H. Each faculty member could expect to have workers in office for about one day.

              I. So faculty members can continue their office work as usual.

              參考答案:

              8.B

              9. D

              10. H

              11. G

              12. C

            【下半年初級商務英語考前沖刺習題】相關文章:

            2016下半年BEC商務英語初級沖刺習題01-14

            《社會工作實務(初級)》考前沖刺習題04-25

            2016下半年BEC商務英語初級考試閱讀沖刺習題05-23

            2016年下半年劍橋商務英語初級沖刺習題03-18

            2016年商務英語(BEC)考前初級沖刺試題02-12

            2017年初級護師考前沖刺習題05-15

            2016年商務英語BEC初級考前模擬習題03-22

            劍橋商務英語初級考前模擬練習題04-15

            2016年BEC商務英語初級沖刺模擬習題07-23

            <delect id="sj01t"></delect>
            1. <em id="sj01t"><label id="sj01t"></label></em>
            2. <div id="sj01t"></div>
              1. <em id="sj01t"></em>

                      <div id="sj01t"></div>
                      黄色视频在线观看